CLICK TO DOWNLOAD SERVICES PACKET
STANDARD DELIVERABLES
*Finish Grade surface and it’s 3D Linework
*Background 2D Linework
*Background 2D Utillity 2D Linework
*Centerline Alignments for Roadways
*Layout Points upon Request
*Machine Control Model Design Report (MCMDR)
OPTIONAL DELIVERABLES
1. Surface and 3D linework: Subgrade to top of Dirt (DIRT)
2. Surface and 3D linework: Subgrade to top of Subballast or Aggbase (SUBL or AGGB)
3. Surface and 3D linework: Utility Network to invert of Pipe (STM, WTR, SAN, GAS, and/or ELEC)
4. Surface and 3D linework: Temporary Erosion Control (ESC)
5. Surface and 3D linework: Temporary Rough Mass Grade (MASS)
6. Surface and 3D linework: Building Foundation to top or bottom of Footing (FNDN)
7. Surface and 3D linework: Retaining Wall to top or bottom of Footing (WALL)
8. Surface and 3D linework: Bridge Deck (BRDG)
9. Surface and 3D linework: Bridge Deflection (DEFL)
10. Construction Layout: Building Foundation and Footing linework
11. Construction Layout: Utility Pipe and Structure elevated linework and points
12. Construction Layout: Curb machine alignment files
13. Construction Layout: Paving machine alignment files
14. Takeoff Quantities: Surface-to-surface takeoff of completed model with cut/fill color map
15. Special Requests: All other special scope needs can be requested with the Project Manager