STANDARD DELIVERABLES
• FINISH GRADE surface and its associated 3D linework of the proposed site improvements
• Background 2D linework from the engineer’s CAD files
• Background 2D utility linework from the engineer’s CAD files
• Centerline alignments (HAL and VAL) for all proposed alignments
• Signed/sealed MCMDR detailing the plan conflicts, plan typos, and project notes
OPTIONAL DELIVERABLES
1. Surface and 3D linework: Temporary Erosion Control (ESC)
2. Surface and 3D linework: Utility Network to invert of Pipe (STM, WTR, SAN)
3. Surface and 3D Linework: Existing/original ground based on survey contours
4. Surface and 3D linework: Subgrade to top of Dirt (DIRT)
5. Surface and 3D linework: Subgrade to top of Sub ballast or Aggbase (SUBL or AGGB)
6. Surface and 3D linework: Bridge or Retaining Wall to top or bottom of Footing (WALL)
7. Surface and 3D linework: Temporary Rough Mass Grade (MASS)
8. Surface and 3D linework: Bridge Deck or Beam (BRDG)
9. Surface and 3D linework: Bridge Deflection (DEFL)
10. Surface and 3D linework: Building Foundation to top or bottom of Footing (FNDN)
11. Construction Layout: Curb, sidewalk, and/or paving machine control alignment files
12. Construction Layout: Building Foundation and Footing linework
13. Construction Layout: Utility Pipe and Structure elevated linework and points
14. Special Requests: All other special scope needs can be requested with the project manager
DIRT QUALITY TAKOFFS
Surface to surface dirt quantity takeoff (without subgrade adjustments), or full quantity dirt takeoff (including all subgrade depths). Topsoil removal/replacement upon request. All takeoff’s include a cut/fill color map. Additional cost for need to digitize plans (ie. no CAD available).